Abbonarsi

Ninety-minute accelerated critical pathway for chest pain evaluation - 03/09/11

Doi : 10.1016/S0002-9149(01)01801-X 
Siu Ming Ng, BS a, Padma Krishnaswamy, MD a, Robin Morissey, RN a, Paul Clopton, MS c, Robert Fitzgerald, PhD b, Alan S Maisel, MD a,
a Department of Medicine, University of California, San Diego, California, USA 
b Department of Pathology, Division of Cardiology, University of California, San Diego, California, USA 
c Statistical Research Department, Veteran’s Affairs Medical Center, San Diego, California, USA 

*Address for reprints: Alan Maisel, MD, VAMC Cardiology 111-A, 3350 La Jolla Village Drive, San Diego, California 92161

Abstract

Rapid, efficient, and accurate evaluation of chest pain patients in the emergency department optimizes patient care from public health, economic, and liability perspectives. To evaluate the performance of an accelerated critical pathway for patients with suspected coronary ischemia that utilizes clinical history, electrocardiographic findings, and triple cardiac marker testing (cardiac troponin I [cTnI], myoglobin, and creatine kinase-MB [CK-MB]), we performed an observational study of a chest pain critical pathway in the setting of a large Emergency Department at the Veterans Affairs Medical Center in 1,285 consecutive patients with signs and symptoms of cardiac ischemia. The accelerated critical pathway for chest pain evaluation was analyzed for: (1) accuracy in triaging of patients within 90 minutes of presentation, (2) sensitivity, specificity, positive predictive value, and negative predictive value of cTnI, myoglobin, and CK-MB in diagnosing acute myocardial infarction (MI) within 90 minutes, and (3) impact on Coronary Care Unit (CCU) admissions. All MIs were diagnosed within 90 minutes of presentation (sensitivity 100%, specificity 94%, positive predictive value 47%, negative predictive value 100%). CCU admissions decreased by 40%. Ninety percent of patients with negative cardiac markers and a negative electrocardiogram at 90 minutes were discharged home with 1 patient returning with an MI (0.2%) within the next 30 days. Thus, a simple, inexpensive, yet aggressive critical pathway that utilizes high-risk features from clinical history, electrocardiographic changes, and rapid point-of-care testing of 3 cardiac markers allows for accurate triaging of chest pain patients within 90 minutes of presenting to the emergency department.

Il testo completo di questo articolo è disponibile in PDF.

Mappa


© 2001  Excerpta Medica Inc. Tutti i diritti riservati.
Aggiungere alla mia biblioteca Togliere dalla mia biblioteca Stampare
Esportazione

    Citazioni Export

  • File

  • Contenuto

Vol 88 - N° 6

P. 611-617 - settembre 2001 Ritorno al numero
Articolo precedente Articolo precedente
  • The “SHAHAL” experience in Israel for improving diagnosis of acute coronary syndromes in the prehospital setting
  • Arie Roth, Naomi Malov, Michal Golovner, Judith Sander, Itzhak Shapira, Elieser Kaplinsky, Shlomo Laniado
| Articolo seguente Articolo seguente
  • Effect on survival of acute myocardial infarction in Killip classes II or III patients undergoing invasive coronary procedures
  • David Rott, Solomon Behar, Jonathan Leor, Hanoch Hod, Valentina Boyko, Lori Mandelzweig, Shmuel Gottlieb, for the Working Group on Intensive Cardiac Care Israel Heart Society?A complete list of the study participants appears in American Heart Journal 2001;141:267–276. ?

Benvenuto su EM|consulte, il riferimento dei professionisti della salute.
L'accesso al testo integrale di questo articolo richiede un abbonamento.

Già abbonato a @@106933@@ rivista ?

@@150455@@ Voir plus

Il mio account


Dichiarazione CNIL

EM-CONSULTE.COM è registrato presso la CNIL, dichiarazione n. 1286925.

Ai sensi della legge n. 78-17 del 6 gennaio 1978 sull'informatica, sui file e sulle libertà, Lei puo' esercitare i diritti di opposizione (art.26 della legge), di accesso (art.34 a 38 Legge), e di rettifica (art.36 della legge) per i dati che La riguardano. Lei puo' cosi chiedere che siano rettificati, compeltati, chiariti, aggiornati o cancellati i suoi dati personali inesati, incompleti, equivoci, obsoleti o la cui raccolta o di uso o di conservazione sono vietati.
Le informazioni relative ai visitatori del nostro sito, compresa la loro identità, sono confidenziali.
Il responsabile del sito si impegna sull'onore a rispettare le condizioni legali di confidenzialità applicabili in Francia e a non divulgare tali informazioni a terzi.


Tutto il contenuto di questo sito: Copyright © 2026 Elsevier, i suoi licenziatari e contributori. Tutti i diritti sono riservati. Inclusi diritti per estrazione di testo e di dati, addestramento dell’intelligenza artificiale, e tecnologie simili. Per tutto il contenuto ‘open access’ sono applicati i termini della licenza Creative Commons.